← roman martins

the forkable factory map

every phase between an idea and a shipped physical product. green where the tech exists today, amber where it is partial, red where it is missing, violet where forkable factory has shipped a piece. this is a working diagram. it expands every time something ships.

updated 2026-04-30·sourcing data from api probe 2026-05-11·end-to-end score: the index →
forkability check

today, a fork can run end-to-end through phase 2 of 10 spec.

the chain is the longest contiguous run of phases where forkability ≥ 70%. that is the answer to "is this thesis actually executable today."

live
12
ff-built
10
partial
17
missing
15
54 elements across 10 phases
legend
live
existing tech, plug and play
ff-built
shipped by forkable factory
partial
exists but clunky or incomplete
missing
gap, ff needs to fill
·